Logan Martin Dam
Vincent, AL

Spring 2018 – Fall 2018

PM – Mark Maynard Installation of (2) 2400 hp centrifugal blowers that force air through a 36” SS main aeration line into the powerhouse and discharge it into the draft tube to oxygenate the water to help sustain fish populations near the dam.

Date

July 29, 2013

Client

Logan Martin Dam

Category

IMAGE